The following log details the termination procedures undertaken at Site-96 on cycle 437. The primary objective of the operation was to neutralize a subject classified as Euclid designation. Initial reports indicate that the termination protocol was partially successful with minimal collateral damage. Subject containment breach occurred at approximately cycle delta 18. Further investigation into the incident's source is ongoing.
- Key contributors to termination process: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
- Weapons and equipment deployed:: M-Class payloads, dimensional anchor.
Further details regarding the incident are currently classified.
Euclid Containment Breach - Site 96
On 04/23/YY| During midday, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-XXX. Initial reports indicate improper protocol execution as the primary cause. Security personnel were immediately dispatched to the affected area and engaged with minimal resistance.
- The breached entity exhibited uncharacteristic aggression, posing a potential threat to surrounding infrastructure and personnel.
- Initial containment protocols were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with on-site technicians currently at work.
- Public disclosure| The Foundation has issued a temporary site lockdown order.
Unit Delta-7: : Site Ninety Six Protocol Engaged
A hostile force has been detected within the perimeter. All personnel are to assume combat positions and await further directives.
Subject Delta-7 is to initiate {Site Ninety Six Protocol{ immediately. All capabilities are to be allocated as needed.
- Maintain radio silence unless absolutely necessary.
- Record all occurrences immediately.
- Stay alert at all times. This is a critical situation.
Site-96 Anomaly Analysis Summary
A comprehensive assessment of the anomalous events at Site-96 has been finalized. The primary findings indicate a complex and evolving system exhibiting traits consistent with paraconsistent activity. Further research is required to elucidate the nature and goal of this anomaly.
- Key findings:
- Persistent energy fluctuations
- Spatial distortions
- Encoded messages
Recommendations include increased monitoring of the site and deployment of a dedicated research team. Containment procedures should be reassessed to reflect the evolving nature of this anomaly.
Site Alpha-2: Emergency Lockdown Procedure
A complete lockdown has here been implemented within Secure Zone Alpha-2, specifically at Site 96. All personnel are to be confined to designated safe areas and cease all non-essential operations. External access to the site has been terminated. Any unauthorized individuals attempting to breach the perimeter will be handled according to protocol.
Preliminary intelligence suggests a potential incursion. The situation is being actively monitored by security forces, and updates will be communicated as they become available.
Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.
Examination into Anomalous Signal Originating from Site-96
Preliminary analysis of the anomalous signal detected at Site-96 indicates a probable source originating from deep within the structure. The signal, characterized by irregular fluctuations in electromagnetic range, has exhibited distinct intensity spikes at specific frequencies. Attempts are currently underway to identify the exact source of the signal and determine its type. A group of specialist researchers, including cryptographers, physicists, and specialist scientists, have been deployed to Site-96 to conduct a thorough investigation.
- Initial findings suggest the signal may be man-made, though more analysis is required for establishment.
- Security protocols at Site-96 have been increased in light of the anomalous event.
- Access to the site is currently denied to authorized personnel only.